Penmann recently finalised a tailored HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a fully engineered ventilation and climate control system built to comply with strict hygiene and production requirements. The project covered the design, supply, installation and commissioning of high-specification HVAC systems across non-production, Medium Care (MC) and High https://bookmarkmiracle.com/story22395940/the-penmann-team-finalises-major-hvac-upgrade-for-nutricia-s-liverpool-site-in-line-with-fsi-phase-1-and-2