Project Highlight At a prominent confectionery site in York, Newsome has commissioned a high-capacity 400 kW chiller, marking the successful realisation of the project. Designed to strengthen ESG targets, the installation boosts process efficiency while lowering overall power consumption and CO₂ levels. https://7bookmarks.com/story20581919/advanced-400-kw-chiller-installation-delivers-50-000-yearly-energy-savings-and-200-metric-tonnes-co%E2%82%82-cut